Planned Roads and Transport Engineering Department

Rehabilitation of Wadi Al-Nar Street

Rehabilitate the main commercial corridor with safer sidewalks and traffic calming.

Current progress
50%
Budget
ILS 2,000,000
Location
Wadi Al-Nar Street

Project scope

The project covers resurfacing 1.8 km of roadway, new sidewalks, safer crossings, and efficient lighting around the central market.

Updates

1 updates

Sidewalk installation started

2026-05-10

Sidewalk paving and accessible tactile elements have started.

Photo gallery

First resurfacing segment
First resurfacing segment
First resurfacing segment
New sidewalk works
New sidewalk works
New sidewalk works
انهاء اعمال اسفلة المرحلة الأولى من شارع واد النار (المسلخ)
انهاء اعمال اسفلة المرحلة الأولى من شارع واد النار (المسلخ)
انهاء اعمال اسفلة المرحلة الأولى من شارع واد النار (المسلخ)
الاستلام الابتدائي لمشروع تأهيل وتعبيد شارع المسلخ
الاستلام الابتدائي لمشروع تأهيل وتعبيد شارع المسلخ
الاستلام الابتدائي لمشروع تأهيل وتعبيد شارع المسلخ